Transition assembly – Wheatheart GHR Augers Intake Hopper User Manual

Page 8

Advertising
background image

2. A

SSEMBLY

W

HEATHEART

- I

NTAKE

H

OPPER

2.2. T

RANSITION

A

SSEMBLY

BH/GHR A

UGERS

8

30735 R1

3. The top tube clamp has a slot to fit around the handle, which is already

welded on the tube.

4. Take the transition flight and slide it onto the lower flight.
5. For continuous flow, make sure that the ends of the lower flight and the

transition flight are butting together. See Figure 2.2.

Figure 2.2

6. Spin the flight to line up hole on transition flight with the hole in the lower flight

tube.

7. Insert 3/8" x 2-1/2" bolt for 8" augers, or 3/8" x 3-1/4" bolt for 10" augers,

1/2” x 4-1/2” for 13” augers and tighten locknut.

2.2. TRANSITION ASSEMBLY

1. Using a lift crane or other lifting equipment, lift lower tube up to a comfortable

working height.

2. Make sure transition is vertical to tube. See Figure 2.4.

Advertising
This manual is related to the following products: