Installation

4. Connect the med gas and electrical sources to the terminations on the headwall (see

Figure 7

and

Figure 8

).

a. The unit should be mounted in such a way that the

front of the unit protrudes 5/8" from the drywall

surface (see

Figure 5

). (E.g. If a 5/8" drywall is being

used, the front of the unit should be 1-1/4" from the

stud face.)

Figure 5

b. Ensure that the mounting location corresponds to the on-site rough-in locations.

c. Once the headwall is in the correct position, attach the headwall to the studs using the slots on the

side and the frame provided with the unit. (see

Figure 6

) Use hardware that is compliant with ap-

plicable local building codes.

Figure 7

Figure 8

Figure 6