Basket installation – Amico Monitor Roll Stands User Manual

Page 9

Advertising
background image

www.amico.com

8

INCORRECT

CORRECT

Clamp Device

Roll Stand

Post

Clamp Assembly

on Basket

Figure 4

Figure 5

Basket

Roll Stand Post

3/16’’ (47.6 mm)

HEX Bolt

Clamp Device

Clamp Assembly

Double Clamp Basket Sample

Tighten using Cross Pattern

Figure 6

WARNING:

DO NOT tighten one screw all the way into the clamp assembly without tightening the other. Only

tighten the first screw after the second screw is at least half way into the clamp assembly or the clamp may be
damaged.

(Figure 4)

WARNING:

DO NOT overtighten the screws as this may strip the thread.

WARNING:

The basket is rated for up to 10 lbs (4.547 kg). Ensure the load that is placed in the basket does not

exceed this weight.

1. Remove the clamp devices from the basket assembly using the 3/16" (47.6 mm) HEX Key, and place the clamp

assembly at the desired height on the Roll Stand post.

2. Line the holes of the top clamp assembly on the basket with the holes on the clamp device. Partially secure

one of the two bolts BUT DO NOT TIGHTEN, then partially secure the second bolt. Once both bolts are started,

partially secure the bolts in the bottom clamp assembly in the same way. Once all four bolts are partially secured,
Tighten in a CROSS Pattern.

(Figure 5 and 6)

Basket Installation

Ч

Advertising