Amico 18" Floor Pedestal User Manual

Page 7

Advertising
background image

Other Installation Notes

1. Division 15 to connect gas stubs on floor pedestal to building medical gas supply lines previously

roughed in.

2. Division 16 to feed flexible electrical conduits through bottom of floor pedestals into ground for

connection to normal, emergency and low voltage sources provided in ground by division 16 contractor.

www.amico.com

7

Advertising
This manual is related to the following products: