Installing the fan assembly – Cisco 5500 User Manual

Page 16

Advertising
background image

7-16

Cisco MGC Software Release 7 Operations, Maintenance, and Troubleshooting Guide

OL-0542-06

Chapter 7 Maintaining the Cisco Catalyst 5500 Multiswitch Router

Replacing Hardware Components

Note

The fan assembly is designed to be removed and replaced while the system is operating without
presenting an electrical hazard or damage to the system.

Step 1

Locate the fan assembly to the left of the card cage (see

Figure 7-13

).

Step 2

Loosen the two captive installation screws by turning them counterclockwise.

Step 3

Grasp the fan assembly with both hands and pull it outward, joggling it if necessary to unseat it from the
backplane. Pull it clear of the chassis and place it in a safe location.

Installing the Fan Assembly

Perform the following steps to install the new fan assembly:

Step 1

Hold the fan assembly with the fans facing to the right.

Step 2

Place the fan assembly into the front chassis cavity so that it rests on the chassis, and then lift the fan
assembly up slightly, aligning the top and bottom guides.

Step 3

Push the fan assembly into the chassis until the captive installation screws meet the chassis.

Step 4

Tighten the captive installation screws by turning them clockwise.

Figure 7-13 Cisco Catalyst 5500 Chassis Fan Assembly

H10647

SUPERVISOR ENGINE

SY

ST

EM

ST

AT

US

FA

N

AC

TIV

E

M

DI X

M

II

M

DI X

MII

RESET

CO

NSO

LE

100%

1%

SW

ITC

H

LO

G

PS2

10

0 M

bps

LINK

100 M

bps

LINK

PO

RT 1

PS1

PO

RT 2

SUPERVISOR ENGINE

SY

ST

EM

ST

AT

US

FAN

ACTIVE

MDI X

MII

MDI X

MII

RESET

CONSOLE

100%

1%

SWITCH

LOG

PS2

100 Mbps

LINK

100 Mbps

LINK

PORT 1

PS1

PORT 2

Advertising