Edge Lighting Light Channel Trim 1.6 User Manual

Light channel trim 1.6, Installation instructions for, Important information

Advertising
background image

Installation Instructions for

Light Channel Trim 1.6

1718 W. Fullerton Ave

Chicago, IL 60614

Tel: 773-770-1195

Fax: 773-935-5613

www.edgelighting.com

[email protected]

© 2013 Edge Lighting. All Rights Reserved.

SAVE THESE INSTRUCTIONS!

IMPORTANT INFORMATION

904-LCT-1_6_02

1

LCT1.6-5WDC-_

1
junction box (mounts to any side of the housing
depending on the orientation of the channel) and secure
them with the mounting brackets and two Phillips screws
provided.

: Mount each adjustable mounting bar to one side of the

- This fixture is wall or ceiling mount.
- This instruction shows a typical installation.
- If modifying channel length, please see “Section
Three: Modifying Channel Length” on Page 4 before
installation.

A

JUNCTION
BOX

JUNCTION
BOX

MOUNTING
BRACKET

ADJUSTABLE
MOUNTING BAR

PHILLIPS
SCREW

VERTICAL

ORIENTATION

HORIZONTAL

ORIENTATION

Section One: Installing The Channel

NOTE:

The adjustable mounting bars mount to studs that are

spaced 13" to 24" apart.

2: Select the location between the two studs for the junction
box to be mounted.

3: Place the adjustable mounting bars between the studs.

4: Make sure the lips on the adjustable mounting bars are
against the studs. Secure the adjustable bars to the studs
with the eight #8 screws.

JUNCTION
BOX

ADJUSTABLE
MOUNTING BAR

STUD

#8 SCREW

B

4

3

STUD

ADJUSTABLE
MOUNTING BAR

CONDUIT

JUNCTION BOX

C

5

6

5: Remove a knockout to install the power line conduit.

6: Install the conduit and run the low voltage 24V DC power
wires coming from the remote power supply to the
junction box.

7: Refer to the instruction provided with the power supply
along with the wiring diagram for proper wiring.

Advertising
Table of contents