Edge Lighting Kurve Display Sign User Manual

Through-power angle and kurve display sign w/feed, Install the fixture, Installation instructions for

Advertising
background image

Installation Instructions for

Through-Power

Angle and Kurve Display Sign w/Feed

Install the Fixture

1718 W. Fullerton Ave

Chicago, IL 60614

Tel: 773-770-1195

Fax: 773-935-5613

www.edgelighting.com

[email protected]

© 2013 Edge Lighting. All Rights Reserved.

SAVE THESE INSTRUCTIONS!

- This instruction shows a typical installation.

IMPORTANT INFORMATION

1
hinge. Typically, the furthest left hinge contains the power
wires.

: Measure the distance from center of each hinge to the other

904-KAD-FTP-02

A

1

AD-7WDC-FTP-__

MEASURE

CHANNEL

B

2: Mark the measured points on the wall where the fixture is to
be mounted.

CHANNEL

HINGE

1

MARK

MEASUREMENTS FROM STEP 1

2

2

3: Using a 7/16" bit, drill out the left marked hole through the
front & back drywall surfaces.

C

DRYWALL

POWER
FEED HOLE

3

D

4: Insert and tighten the nipple into the back of the stem base
with threads, for the power feed.

NIPPLE

THREADED
STEM BASE

4

ANCHOR FOR
STANDOFF POST

WALL

5:

6:

Mark additional points at 0.6" to the top & bottom of the

drilled and marked points.

Use a hammer to tap in the anchors on the (new) marked

points up to the threaded portion.

7: Screw in the threaded portion of the anchors with a Phillips
screwdriver.

E

0.6"

APART

6

7

5

SIDE VIEW

NOTE:

The base holes should be in a vertical position at 90°

angle to the direction of the fixture.

HINGE

MARKED
POINT

0.6"

APART

NOTE:

Depending on fixture length, the fixture is provided with 2

to 4 hinges.

KD-7WDC-FTP-__

MARK

Advertising
This manual is related to the following products:
Table of contents