Edge Lighting Cirrus Channel, Direct 1" Lens User Manual

Page 4

Advertising
background image

JUNCTION BOX
OPENING

NOTE:

If the receiving bracket interferes with the Junction box,

then relocate the bracket by loosening the set screws and make
the necessary adjustments.

NOTE:

The channel must pass through the center of the

Junction box.

10: Start off the installation using the channel with the power
wire. Lay the channel to the desired location & make all
necessary markings which will consist of the channel ends,
locking clips and mounting clips. Mounting clips must be
installed every 20" from each locking clip, locking
mounting clips are not necessary for channels under
2ft.

11: After all markings and required measurements are done,
take the channels apart from each other.

N

MOUNTING
CLIP (C-MCL)

12: Line up the locking clips & mounting clips to anchor holes
and secure them by tightening the two #6 screws through
the clip holes followed by the washers into the anchors.

12

13: Optional: Use the Goof Plate if the junction box
opening has a lot of imperfection/jagged edges. Install the
provided goof plate (paint to match prior) with the two
screws.

O

JUNCTION BOX
OPENING EDGE

GOOF PLATE
(ONLY USE IF JAGGED
PLASTER EDGE, PAINT
TO MATCH)

SCREW

13

PLASTER THE EDGE OF

THE JUNCTION BOX

13

BOTTOM OF CHANNEL

RECEIVING BRACKET

M

POWER FEED END

OF CHANNEL

CHANNEL

END

MOUNTING
CLIP (C-MCL)

MARKING LOCATION

LOCKING CLIP

10

EVERY 20 INCHES

10

12

LOCKING CLIP

WASHER
(OPTIONAL)

ANCHOR

LOCKING CLIP

#6 SCREW

L

7

DRYWALL

RECTANGLE
OPENING

7:
opening will be located depending on selected position.

8: Cut out the marked rectangle opening, using a "Dremel
Multi-Max" with the "wood & drywall" cutting bit.

9: Install & finish drywall.

Mark a rectangle shape on drywall where the junction box

DREMEL
MULTI-MAX

WOOD & DRYWALL
CUTTING BIT

8

4

Advertising