Mechanical Installation

Welding part

Please refer to “Accessories” data sheet. The welding part has an
engraved mark or hole. When the product has been mounted and
correctly tightened the gland or M12 plug will align with this mark.
Make sure that the gland/plug is pointing downwards to prevent fl uids
from penetrating into the instrument.

Cautions

Use only the authorised special designed accessories.
The product warranty is void when installed with other adapters.

The sensor can not be shortened.

Please be aware of the active measuring zone on the rod
(see drawing)

Do not use tefl on, paper or other gaskets.

The process connection must have electrical contact with the tank.
if not, a separate grounding cable must be installed.

If the tank is non-conductive an additional ground electrode must be
installed. This should have electrical connection to the LSP process
connection.

Make sure that the rod can not touch the tank wall even with the high-
est movement of the media.

When installed <100 mm from the tank wall the rod must be parallel
with the tank wall. For larger distances non-parallelity can be allowed.

After carefully insertion of the sensor into the welding part tighten the
union with a torque of 20...30 Nm.

After Installation and Confi guration

Check the leak tightness of the sleeve.

Check the tightness of glands or M12 plugs.

Check the tightness of the cover.

Check that the rod is not touching the tank wall.

[mm]

ш89

92

8

33

ш10

G1

AF36

M12 plug

Dimensional Drawings

L

Gland

ø55 housing

ø89 housing

125
145

ш8

ш8

Interconnection cable.
Specify length.

LSP050/LSP051 - integrated electronics

LSP055/LSP056 - separate electronics

Active zone


5 mm