Quick evaluation before installation – Cobra Electronics CPI-2500 User Manual

Page 5

Advertising
background image

5

Nothing

comes close to a Cobra

4

English

Quick Evaluation
Before Installation

Introduction

Quick Evaluation
Before Installation

Introduction

Quick Evaluation Before Installation

This section provides you with basic information about
the inverter and how to check its performance before
installation.

Be Sure to Have on Hand:

A 12 volt DC power source (such as a vehicle battery).

1. The power source must provide

between 11 and 15 volts DC and
be able to supply enough current
to run the test load. As a rough
guide, divide the wattage of the
test load by 10 to get the current
(in amperes) the power source
must deliver.

A set of cables to connect the power source to the
inverter (not included).

The cables must be as short and thick as possible in
order to reduce the voltage drop between the power
source and the inverter when drawing current from
the power source.

If the cable suffers an excessive voltage drop, the inverter
may shut down when drawing higher currents because
the voltage at the inverter dropped below 10 volts.

#4 AWG stranded copper cable is recommended.
It should be no longer than 1.5 meters (4 ft.).

The end of the cable that connects to the inverter must
have its insulation stripped off for about

1

2

inch (1.25 cm)

back from the end, exposing the bare copper.

The other end of the cable, which connects to the power
source, must be terminated with a lug or other connector
that provides a secure, low resistance connection.

For example, if the power source is a battery, the cable
must be terminated with a battery terminal that clamps
to the post on the battery.

A test load that can be plugged into the AC receptacle on
the inverter for short term testing at a low power level.
The following cables are recommended for testing low
power level test loads only.

Test Load

Minimum

Power

Cable Size

100w

# 16 AWG copper

250w

# 12 AWG copper

500w

# 8 AWG copper

To Check Your Inverter’s Performance Before Installation:

1. Turn the inverter Off (see page 14

for details). If the power source is
a DC power supply, switch it Off
as well.

2. Connect cables to Power Input

Terminals (see page 8 for details).

3. Connect cables to power source

(see page 8 for details).

4. Check to make sure all

connections are secure.

5. Turn the inverter On. If the

power source is a DC power
supply, switch it On first.

6. Plug in the test load.

The inverter should supply power
to the load. If the inverter is not
working properly, refer to the
Troubleshooting Guide on page 18
or Power and Protection Indicators
section on page 16.

Power Supply

Test Load

On/Off Switch to Off

Connect Terminals

Connect Power Source

On/Off Switch to On

Connect Test Load

Advertising