Rear vent – Vermont Casting 4065 User Manual

Page 14

Advertising
background image

14

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters

20007066

2. Locate the vent opening on the wall. Refer to

Figures 17, 18 & 19 to determine the top of the
opening centerline. It may be necessary to first
position the stove and measure to find the hole
location. Depending on whether the wall is made of
combustible materials, cut the opening to the size
shown in Figure 17. Combustible wall openings must
be framed as shown in Figure 17.

27

³⁄₈

"

(695mm)
to Top of

Opening

Firestop

Ventilated Wall Plate -
Open End Down

Finishing Collar

Seal
Around
Terminal

9

³⁄₈

” W x 10

³⁄₈

” H

Wall Opening

ST400

Wall Sleeve -
Seal Around

Fig. 18 SDVR with Rear Vent Kit 7TFSRSK installation.

9

³⁄₈

"

(240mm)

10

³⁄₈

"

(265mm)

7

¹⁄₂

" Dia.

(190mm)

VO584-100

Fig. 17 Locate vent opening.

Framing Detail

Vent Opening - Combustible Wall

Vent Opening -Noncombustible Wall

Venting System Assembly -

Direct Vent

General Information

The PDV20 and SDVR are approved for installation
only with the vent components listed on Page 13.
Follow the vent component instructions exactly. These
instructions apply to both the PDV20 and the SDVR
shell.

For U.S. installations: The venting system must
conform with local codes and/or the current National
Fuel Gas Code, ANSI Z223.1/NFPA 54

For Canadian installations: The venting system must
conform to the current CSA B149.1 installation code.

Rear Vent

Use Rear Vent Kit 7TFSRSK for an installation where
the heater is parallel to the wall and the vent system
extends straight back through that wall.

1. Attach Inner Starter Pipe, (found in with the logset),

to the stove.

Run a bead of sealant beneath the pipe bead and

attach to the stove using three 1/4-20 x 3/8” phillips
screws provided in the parts bag. (Fig. 16)

MOTOR

SNAPSTAT

ON/OFF
RHEOSTAT

WHT

WHT

BLK

BLK

BLK

GRN

BLK

Blower Wiring Diagram

Fan Assembly

No. 000-2960 / FK28

WARNING:
DISCONNECT
ELECTRICAL SUPPLY
BEFORE SERVICING

Fig. 15 Blower wiring diagram.

Sealant

Phillips
Screws

ST396a

Fig. 16 Apply sealant to the starter pipe, and fasten to stove
with Phillips screws.

Rheostat

Retaining Nut

Rheostat Knob

FK104

Fig. 14 Attach rheostat to bracket.

Advertising
This manual is related to the following products: