Mounting, Mounting bracket – Chauvet Q-WASH 250 User Manual

Page 8

Advertising
background image

Introduction

Q-Wash 250 User Manual

8

2006-05-17/13:18

1. Clamp

2. Mounting plate

3. Bracket

1

2

3

Safety Cable & Clamp sold

separately!

Mounting Bracket

Mounting

O r i e n t a t i o n

The Q-Wash

250 can sit on stage or be mounted on a truss using a clamp in any position,

provided, there is adequate room for ventilation.

W a r n i n g

It is important never to obstruct the fan or vents pathway.

The installation of the projector has to be built and constructed in a way that it can hold 10 times

the weight for 1 hour without any harming deformation.

The installation must always be secured with a secondary safety attachment, e.g. an appropriate

catch net. This secondary safety attachment must be constructed in a way that no part of the
installation can fall down if the main attachment fails.

When rigging, derigging or servicing the fixture staying in the area below the installation place, on

bridges, under high working places and other endangered areas is forbidden.

IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not

limited to) calculating working load limits, installation material being used, and periodic safety
inspection of all installation material and the projector. If you lack these qualifications, do not
attempt the installation yourself, but instead use a professional structural rigger. Improper
installation can result in bodily injury and or damage to property.

The projector should be installed out of the reach of people.

When selecting installation location, take into consideration lamp replacement access and routine

maintenance.

Safety cables should always be used.

Never mount in places where the fixture will be exposed to rain, high humidity, extreme

temperature changes or restricted ventilation.

The fixture must have a minimum of 1 meter from combustible materials.

R i g g i n g

The Q-Wash

™ 250 includes a mounting bracket to which 2 rigging clamps can be bolted.


1. Verify the structure can hold 10 times the weight of all to-be installed fixtures.

2. From a stable platform, attach two clamps as illustrated on drawing above.

Advertising