Chateau, Min. 2' (610mm) – Vermont Casting ChateauTM DVT38IN User Manual

Page 24

Advertising
background image

24

Chateau™

20011956

FP593

SR/C

11/20/97

Attic Installation

Ceiling Installation

Nails (4)

Firestop Spacer

Joist

Joist

Firestop Spacer

Nails (4)

FP593

Fig. 31 Installing firestop spacer.

FP263

MBUF

5/9/96

Attic

Insulation

Shield

Ceiling

Base

Flanges

Nails (4 Re-

quired)

Attic Joist

FP263

Fig. 32 Attic shield installation.

If an attic is above ceiling level an AIS-SK
(Attic Insulation Shield) must be installed.
The enlarged ends of the vent section
always face downward.

Min.

2' (610mm)

CFM190

TTR Ternim. 2'

1/25/02 sta

CFM190

Fig. 34 Minimum termination to roof clearance.

FP270/271

CR Series

2/19/99 djt

Support Structure

Elbow Strap

(must be tight)

Ceiling Hole

Framing

Angled Firestop

Chimney Support Strap

(must be tight)

FP270/271

Elbow Strap

Angled Strap

Fig. 33 Attach straps to a structural framing member.

Advertising