Preparing for installation, Required tools and equipment, C h a p t e r – Cisco 7300-6T3 User Manual

Page 23

Advertising
background image

C H A P T E R

2-1

Clear Channel 6-Port T3 (DS3) Line Card Installation and Configuration

OL-3449-02

2

Preparing for Installation

This chapter describes the general equipment, safety, and site preparation requirements for installing the
6T3 line card. This chapter contains the following sections:

Required Tools and Equipment, page 2-1

Software and Hardware Requirements, page 2-2

75-Ohm In-Line Coaxial Attenuator (Optional), page 2-2

Safety Guidelines, page 2-2

Required Tools and Equipment

You need the following tools and parts to install a line card. If you need additional equipment, contact
a service representative for ordering information.

6T3 line card

T3 SMB interface cables

Number 2 Phillips screwdriver

Your own electrostatic discharge (ESD)-prevention equipment or the disposable grounding wrist
strap included with all upgrade kits, field-replaceable units (FRUs), and spares

Antistatic mat

Antistatic container

Attenuator kit (optional)

Advertising