Installation – Craftsman 315.228410 User Manual

Page 7

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

INSTALLATION

ALIGNING THE RIP FENCE AND FRONT RAIL

The rip fence scale indicator is installed on the right
side of the rip fence but can be removed and rein­
stalled on the left side if needed, if a cutting operation

requires placing the rip fence on the left side of the
blade, and you find relocating the indicator necessary,
simply unscrew and re-attach it.

■ Hook the back of the rip fence over the rear rail.

See Figure 12.

Lowper the front of the rip fence

into the groove on the front rail.

See Figure 13.

■ Slide the rip fence back and forth. It should move

freely with about 1/16 in. clearance below the rip
fence. If it doesn’t, loosen the nuts holding the front

rail and adjust the rail up or down.

See Figure 6.

RIP FENCE

Remove the rip fence and repeat on the other side

of the blade. When the fence rides smoothly,
tighten all rail hex nuts with a 12 mm wrench.

Push in the micro-adjust knob and turn it. The gear

on the shaft assembly will engage the rack teeth
on the rack and will move the fence assembly left
or right.

Push down on the rip fence handle to lock the rip

fence in place.

TO INSTALL

INDICATOR

ON LEFT

SIDE

HOOK OVER

REAR RAIL

HERE

Fig. 12

RIP FENCE HANDLE

Fig. 13

Advertising
This manual is related to the following products: