Acolyte RibbonLyte in Channel with Mounting Clips User Manual

Page 3

Advertising
background image

All artwork and images copyright Acolyte Industries Inc.

Use or reprinting prohibited unless explicitly approved by Acolyte Industries.

I N S TA L L AT I O N - - S T E P S 1 - 4

1

3

2

4

Mark points every 1 meter (3.28’) along
the intended path of channel. If channel is
shorter than 1 meter, 2 mounting clips will
be used.

Screw each mounting clip (A) into place
using the proper sized screw for the
mounting clup you’re using. (B).

Reminder: actual mounting clip may differ in
appearance from the mounting clip below,
but installation procedure remains the same.

Drill a pilot hole for the mounting clips with
a drill bit.

Snap channel (C) into mounting clips (A) so
that the channel is held in place.

PA G E 2

C L I C K !

(A)

(A)

(C)

(A)

(B)

Advertising
This manual is related to the following products: