Alumax K-KT914Z User Manual

Page 7

Advertising
background image

PAGE 4

DOOR INSTALLATION STEPS

3

Step

POSITION AND CENTER THE FRAME TOGETHER
WITH WALLJAMBS ONTO THRESHOLD OF

SHOWER BASE.

4

Step

- ADJUST AND LEVEL THE FRAME ASSEMBLY.

- MARK DRILLING LOCATION FOLLOWING PILOT HOLES.

- REMOVE FRAME ASSEMBLY FROM BASE.

ON BOTH SIDES

Advertising