Alumax ABC Series User Manual
Page 5
Advertising
5
06.10 K
ABC32 - ABC36 - ABC42
3
NIVELEZ LA BASE.
4
TESTING THE DRAINAGE.
3B
3A
3A. Level the base by adjusting the legs underneath.
Check your adjustment with a level.
3B. Tighten the hexagon nut to block the legs height.
4A.
the base with a small amount of water.
4B.
Check for any leakage around the drain (some bub-
bles may appear) and below (if you have access to).
Unplug the drain and assure that the drainage is ef-
There must be no puddle of water accumula-
tion in the base.
4C.
I
f water doesn’t drain properly even though the base is
leveled, do not continue this installation.
Please remove the base and return it to your dealer for
exchange.
4A
Advertising