Rzr 900 control box installation – BoonDocker POLARIS RZR XP 900 Control Box Install User Manual

Page 3

Advertising
background image

RZR 900 Control Box Installation

Page 3 of 4

4/25/13

www.boondockers.com

EFI System

The Injector connectors are located under the bed on the clutch side.

The black connectors are for the MAG injector and the Gray connectors are for the PTO injector.

Auxiliary Injectors

Ground location

Attach Aux Inj 1 (Violet wire) to left injector Ground to stock ground location underneath rear seat

Attach Aux Inj 2 (Grey wire) to right injector

Temp Sensor

Boost Reference

Advertising