Notice – Compact Power BOXER 999-823 User Manual

Page 47

Advertising
background image

3-19

Pre-Start Inspection and Operation

10. When all trenching has been completed, raise the trencher boom out of the trench and move

the trencher out of the way.

When the trenching has been completed, move the engine throttle to the idle position and allow

the engine to cool off at idle for 3 - 4 minutes.

11. Lower the trencher boom to the ground.

12. Shut off the engine and clean the trencher chain, tracks, and operator's platform of dirt and

mud.

NOTICE

Advertising