BoonDocker POLARIS: Non-turbo Control Box 2014-15 PRO 800 Operation User Manual

Page 2

Advertising
background image

Orange A/F input wire

1.

Locate the 4 position EFI connector and the 3 position TPS connector (Near ECU) under the left
side panel

2. Unplug the factory connectors and plug the Boondocker harness into the mating connectors.
3. Rout wiring harness so it is away from all moving parts and heat sources. Zip tie harness to keep

secured.

4. Connect the Ground wire to the factory ground located on the Chassis in front of the ECU

location.

5. This control box will come with an Orange wire that can connect to an A/F Gauge. Please Refer

to Section 4. in the 13 RPM control box instructions for more information.

Advertising