Project-out screens – EFCO Special Purpose Windows Installation User Manual

Page 53

Advertising
background image


EFCO CORPORATION 8/4/2014 PART NO. YW40

Page 2 of 7

Window Installation Instructions - Screen Installation Section -
































Completely read the General Installation Instructions and all other sections which pertain
to your project before starting work. These recommendations are for general erection
procedures only. For actual job conditions, see the details on the shop drawings. For
perimeter anchor types and spacing, refer to the approved shop drawings or consult the
project design professional.

Project-Out Screen Installation


1. Attach the screen clips to the window with short

side of the angle towards D.L.O. (must be parallel
with the frame).

NOTE: Clip screws are thread cutting fasteners.
Thread cutting into the aluminum should be done
with a screw wax or a silicone based lubricant to
improve cutting action and reduce the required
torque. If the screen clips are being reapplied, no
lubricant on the screw is required, and the screws
should be started by hand or a hand driver should
be used to prevent cross threading.


2. Open the wicket.

3. Hang on to the slide pins and push the screen

toward the window.


4. Lower the slide pins in to the screen clips.

5. Release after the pins are seated, and press the

pins down to snug to the frame.

Typical Elevation

Viewed From Interior

Advertising