S-5500 SSG and Captured Corner Mullion Installation Instructions

Section III: Typical Anchorage Methods







STEP #5 INSTALL FRAME COMPONENTS – BOLTED WIND LOAD ANCHORS

When the frames are properly aligned and level and plumb, match drill the mullion through the

CENTER

of the set of slots or holes in the anchor. NOTE: The holes must be a minimum of 1” from

the back of the mullion in order to clear any steel reinforcement located inside the system as

may be required on a job specific basis. Use a bolt with a flat washer at the bolt head end. At the

nut end of the bolt, use a flat washer, then a spring lock washer next to the nut as shown. Shim

the anchor at each bolt as shown.

Important:

The nut must be tightened sufficiently to

completely compress the spring lock washer. At wind load connections only, back the nut off a

quarter to half turn to allow free movement of the connection. The threads of the bolts must be
staked, or Loctite must be used to prevent the nut from loosening from the bolt. Remove the

temporary alignment screws. Refer to the approved shop drawings for anchor locations, bolt

sizes, welding requirements, and other job specific information.

Note: It is critical that the
anchors be set to the exact

same elevation and that the

fronts of the anchors are

aligned so that the through

bolt is centered in the adjacent

holes or slots in the anchors.

BUILDING

STRUCTURE

STEEL ANCHOR

PER SHOP

DRAWINGS

Match drill through

center

of slots.

HIGH IMPACT

POLYSTYRENE

HORSESHOE SHIMS

AT EACH BOLT

Anchor bolts (type and

quantity as required by

conditions and loads.)

BOLTED WIND LOAD ANCHORS (DEAD LOAD SIMILAR)

Steel anchor (type and

quantity as required by

conditions and loads.)