Home Legend Engineered Ply T&G User Manual

Page 6

Advertising
background image

Doc. ID: 140

Rev: 2

Effective: 2/24/2014

Page | 6

Pre-Install Activities

• Lay out the board from several cartons. Rack the boards to give you the appearance you want. Colors and shades should be mixed up

evenly. End joints should be staggered; minimum ends stager is 6” and varied.

• Inspect plank quality and grading. If flooring is defective, contact dealer or the store immediately and discontinue installation.
• Lay out trim moldings in advance and find planks or strips whose shade closely coordinates the floor. Set these aside for future use.
• Remove existing base, shoe molding or threshold carefully. They can be used to cover the 1/2” expansion gap left around the edge of

the room.

• Subfloors should be clean prior to the floor installation.
• Undercut doors and casings using a handsaw laid flat on a piece of scrap flooring. This will eliminate difficult scribe cuts.
• Install the underlayment (if used) according to the underlayment manufacture instructions.
• Always use protective foot/pad and proper height adapter plate on the fastening machine to prevent face damage, mallet damage,

and edge bruising.

• TEST FIRE THE POWER NAILER ON SACRIFICIAL FLOOR PLANK ONTO A BOARD. CHECK NAIL PENETRATION. CHECK FOR IMPACT

DAMAGE ON FLOOR FACE. CHECK FOR SPLITTING TONGUE.


Advertising