Floating Installation

Step 1 – Install the First Row

• When possible, begin installation from the straightest wall. It is usually the longest outside wall. If possible, install the floor

perpendicular to the floor joists.

• Cut off the tongue from the first row planks.
• Allow 1/2” expansion gap between plank and the walls. Use spacers or board.
• Place the first plank with the groove sides facing away from the walls.
• Place the upper drop-lock end of the second plank on the lower drop-lock end of the first plank. The ends do not click lock. Maintain

straight edge along the rows.

• Continue placing the succeeding planks to complete the row.

Step 2 – Install the Second and Remaining Rows

• Cut off section of the first plank lengthwise to ensure 6” joints staggering.
• Hold the plank with the tongue facing the previous row. Keep it at about 30° angle.
• Insert the tongue into the groove.
• Make sure the tongue are snuggly and securely engaged in the groove by exerting a constant pressure in the direction of the groove.
• Maintain the pressure while pressing the plank flat to lock the edge joints.
• If there is a slight along the edge joints, it can be eliminated with the help of a tapping block and a plastic mallet. Be careful to prevent

impact damage while doing it.

• The last planks may have to be cut to size.

Step 3 - Install the Last Row

• Use the pull bar to draw the last row to fit tightly to the previous row.