Pre- installation checklist, Installation instructions – Cowon Systems JKP85 User Manual
Page 4
Advertising
Pre- Installation Checklist
cont.
Place the oven on a table or platform
even with the cutout opening.
(Platform must support 275 lbs.)
4
Remove the bottom trim from the
top of the oven. It will be installed at
the end of installation. The trim is
wrapped separately and taped to the
top of the unit.
Installation Instructions
Bottom Trim
Side Trim
Advertising