Old Town Kevlar Skid Plate Kit User Manual

Skid plate kit installation instructions

Advertising
background image

Skid Plate Kit
Installation
Instructions

125 Gilman Falls Road
Building B
Old Town, ME 04468 USA
800-8-KAYAKS

www.oldtowncanoe.com

Please read kit instructions carefully prior to installation.
Many of our kit installations can be viewed at

www.youtube.com/oldtowncanoeandkayak

Rev.A

Issue Date: 12/08/2010

Doc. # K-01.1331.0640

Page 1 of 5


KIT CONTENTS:

Part Number

Description

Quantity

1311.1050 Sandpaper

2

1311.0446 Stirring

Stick

2

1331.0645

Skid Plate Felt

2

1331.0640A Can

Resin

2

1331.0640B Can

Hardener

2

TOOLS REQUIRED: Clean dry cloth * Plastic sheet for drip cover * 2” wide masking tape * Disposable
gloves * Disposable paintbrush * Measuring tape

For Polyethylene canoes: Small handheld propane torch

Before getting started we recommend sorting out and separating the parts for easy access during assembly.

Step 1: Preparing the Surface:

Fig.#1 Masking felt perimeter

14”

 Position canoe upside down in a clean, well-ventilated area out of

direct sunlight

Measure 14 inches from the edge of the black deck to the bottom of
the canoe and place mark. The narrow end of skid plate will start
here.

Lay one piece of the skid plate felt with the smoother side up on the
center of the bottom, using 2 small pieces of masking tape on each
end to hold it in place.

Mask 1/8” away from perimeter of the skid plate with tape – See
Fig.#1. Cut the small tape pieces and remove the felt.

Advertising