Reliance Controls PK50 User Manual

Reliance Controls Equipment

Advertising
background image

POWER INLET ASSEMBLY
CAT. NOS: PK20, PK30, PK50

INSTALLATION INSTRUCTIONS


IMPORTANT:
Installation of this power inlet and related wiring must be done by a qualified electrician
in compliance with all applicable electrical codes.

Specifications:

Reliance

Power Inlet

Power Inlet

Cord Connector

Model

Rating

Configuration

Configuration

PK20

20 A., 125/250 VAC

NEMA L14-20

NEMA L14-20R

PK30

30 A., 125/250 VAC

NEMA L14-30

NEMA L14-30R

PK50

50 A., 125/250 VAC

CS6375

CS6364 or CS6364N


In this package, you will find the following parts:


Installation:

This power inlet assembly is designed to mount in a 2-1/2 inch trade size knockout opening in any Panel/Link

®

Series Reliance Transfer Panel, or comparable enclosure.

1. Locate and remove any convenient 2-1/2 inch trade size (3-inch diameter) knockout opening.

It may be on the side or bottom of the enclosure, but must be located a sufficient distance from
adjacent equipment or obstructions to permit insertion of the power cord connector from the
generator.

2. Raise the hinged cover and temporarily prop it in a 90 degree open position by inserting the 5/8

in. wide shim between the cover and the base, just beneath the hinge. This will permit easy
access to the mounting screws. See following diagram.

Mounting Bracket

(this is the only component
installed inside the enclosure)

Gasket

Shim

Hinged Cover
Assembly

Flanged
Power Inlet

Screws (3)
8-32 x 3/4"