1 load cell wiring to summing board, 4 replacement load cells, Load cell wiring to summing board – Rice Lake BenchMark LP User Manual

Page 12

Advertising
background image

8

Benchmark LP Manual

7. Position load cells with capacity label and

load cell wires facing up, and loosely install

the hex head cap screws (provided).

8. Route the load cell cables along the frame to

the summing board.

9. Secure the cable in position with the

adhesive-backed cables tied supplied in the

h a r d w a r e k i t . S e e F i g u r e 4 - 2 f o r a n

illustration of load cell and cable placement.

NOTE: Do not cut load cell cables.

Figure 4-2. Load cell and wire placement

10. Corner correction trimming and calibration is

necessary after load cell replacement. Follow

t h e i n s t r u c t i o n s i n S e c t i o n 3 . 2 a n d

Section 3.3.

4.3.1

Load Cell Wiring to Summing Board

The four load cells are each wired to their respective

terminals in the summing board according to the

corner numbering system shown in Figure 4-3 and the

coloring code in Table 4-1.

3

4

1

2

Hole for homerun cable

Figure 4-3. Corner numbering (top view)

Table 4-1. Load Cell Wiring

Cable Color Code

Summing Board Terminal

Green

+ Excitation

Black

- Excitation

White

+ Signal

Red

- Signal

4.4

Replacement Load Cells

Table 4-2. Replacement load cells

Capacity of Scale

Load Mount

Load Cell

100 lbs

96823

100272

250 lbs

96824

104645

500 lbs

96825

100273

1000 lbs

96826

100274

Advertising