2 installing the ez mount 1 – Rice Lake Mild Steel User Manual

Page 8

Advertising
background image

4

EZ Mount Installation Guide

Figure 8-1. Parts Illustration

2.2 Installing the EZ Mount 1

1. The type of installation and strength of the mounting surface governs the method

of locating, attaching, and assembling the EZ Mount 1 assembly. Carefully con-

sider three areas which commonly cause accuracy problems:

• Are the supporting legs adequately braced so they will not spread when the

system is fully loaded?

• Does the supporting structure have the necessary strength to prevent excessive

deflection when the system is fully loaded?

• Is there attached equipment such as skirting, venting, or piping which is likely

to cause binding or lack of flexibility?

2. Determine where to position the mount and in which direction it should be ori-

ented. The EZ Mount 1 is designed to allow for lateral movement in the direction

perpendicular to the longitudinal axis of the load cell. These tank weighing units

should be oriented so that the movement due to thermal expansion/contraction is

perpendicular to the longitudinal axis. Sample mounting orientations to accom-

modate expansion for different vessel shapes are as follows:

Top Plate

Loading Bracket

Cotter Pin

Load Cell Bolt

Load Cell

Cotter Pin

Base Plate

Load Pin

Locating Pin

Washer

Load Bar

Advertising
This manual is related to the following products: