0 load cell replacement, Load cell replacement, Figure 7-1 – Rice Lake Farm Bars - U Series Universal Weighbars User Manual

Page 14

Advertising
background image

10

U Series Farmbars Operator’s Manual

7.0

Load Cell Replacement

Tension (Load Cell

I, III)

Compresion (Load Cell

II, IV)

Pin B - Green

Pos. Signal

Pin C - Red

Pos. Signal

Pin D - White

Neg. Signal

II

III

I

IV

Pin A - Black

Pos. Signal (Gnd)

Primary

Bar

Secondary

Bar

Figure 7-1. System Schematic

If load cell replacement is necessary, follow this procedure. Tie some string or wire around the end of the cable for

the load cell being replaced. This string will be used to feed the new load cell cable through the bar and to the

splicing junction when installing the new cell. Remove the one mounting bolt that holds the cell in place. Remove

the cell and cable with the attached string. Check for physical damage to the cell and cable. If the cable is damaged,

it may be replaced by splicing it together.

Note

Figure 7-1 gives the position for the set screws that hold the bearing collars in place. The set screw
positions are NOT all the same! When replacing a cell, you must place the load cell in with the set screws
having proper orientation. If the cell is installed upside down, the scale will not work properly.

Advertising