Tjernlund SS2 SideShot (Discontinued Version - Pre UC1 Universal Control) 8504063 Rev B 11/99 User Manual
Page 11
10
1. Separate the Black burner motor wire from the Orange wire of
the R8184G. NOTE: Do not separate ignition transformer wire
from the Orange.
2. Connect the Black burner motor wire to terminal Y on the
SS2 terminal strip.
3. Connect the Orange wire of the R8184G to the O terminal on
the SS2 terminal strip.
4. Connect the White wire of the R8184G to the R terminal of the
SS2 terminal strip.
NOTE: The White wire from the R8184G will also be connected to
L2 or B2 as normally done when conventional venting.
5. Connect L1 terminal of the SS2 terminal strip to L1.
6. Connect the L2 terminal of the SS2 terminal strip to L2.
7. Connect the Ground to grounding screw in SS2 electrical box.
NOTES: The SS2 is normally interlocked with the primary control of the appliance. Wire all other furnace/boiler controls as
normally done when conventional venting before continuing. Disconnect power from the appliance before attempting to
interlock the SideShot.
LADDER DIAGRAM
CONNECTION DIAGRAM
SS2 CONNECTED TO AN R8184G WITH THE APPLIANCE
BURNER MOTOR LESS THAN 6.2 AMPS @ 120 VAC
SS2 CONNECTED TO A 24 VAC THERMOSTAT CIRCUIT
FURNACE
TERMINAL
STRIP
SIDESHOT
TERMINAL
STRIP
THERMOSTAT
TERMINAL
STRIP