Tjernlund ASLL AireShare Level-to-Level Ventilator Rev 03/09 8504156 User Manual

Page 6

Advertising
background image

10. IMPORTANT: If the combined width of the Joist/Truss thickness, ceiling and subfloor require ASLL Blower sleeve to be expanded

over 13”, adhere both air flow leakage stickers over electrical relief slot opening in Outer Sleeve to prevent air leakage into joist/truss cavity,
(See Diagram K1).

11. Install the Outer Sleeve over Blower Housing. CAUTION: When installing Outer Sleeve make sure electrical relief opening is on the

side electrical enters ASLL, (See Diagram L1).

12. Using the (4) provided black screws, align holes on ASLL Outer Sleeve mounting bracket with holes in sheetrock mounting brack-

et (utilized if ceiling is sheetrock or ceiling tile). Install the (4) screws straight up. The screws must grip the sheetrock mounting
bracket small grip hole if utilized. Do not over tighten screws, (See Diagram M1). If ceiling is unfinished cut (2) pieces from floor
cutout material and secure each piece to the joist/truss and install (4) screws in ASLL Outer Sleeve mounting bracket, (See
Diagram M1).

13. Wire the ASLL as illustrated in the “Wiring” section. Push the wires into the ASLL electrical box and install electrical box cover,

(See Diagram N1).

14. Install ceiling grille into sheetrock mounting bracket with the provided screws, (See Diagram O1). Ceiling grille may be painted if

desired.

15. Insert the floor grille. Unit can be operated by switching the on/off switch below floor grille, (See Diagram P1). ASLL can also be

wired into a 120 VAC wall switch or thermostat if desired, see “Wiring” for details.

DIAGRAM N1

WIRE PER WIRING
DIAGRAM. INSTALL
ELECTRICAL COVER.

INSTALL ASLL ELECTRI-
CAL BOX COVER.

DIAGRAM M1

INSTALL (4) SCREWS
IN OUTER SLEEVE
MOUNTING FLANGE
INTO SHEETROCK
MOUNTING BRACKET.

FOR UNFINISHED CEIL-
INGS, SCREW PIECES
OF WOOD CUT FROM
FLOOR OPENING TO
JOIST/TRUSS TO SUP-
PORT ASLL BLOWER.

DIAGRAM L1

INSTALL OUTER SLEEVE THROUGH CEILING.
CAUTION: ELECTRICAL RELIEF SLOT MUST BE
ON SIDE ELECTRICAL ENTERS ASLL OR DAM-
AGE WILL RESULT.

DIAGRAM P1

ASLL CAN BE OPERATED BY ON/OFF
SWITCH THROUGH FLOOR GRILLE OR IT
CAN BE WIRED INTO A 120 VAC WALL
SWITCH OR THERMOSTAT.

DIAGRAM O1

INSTALL CEILING GRILLE INTO
SHEETROCK MOUNTING BRACKET WITH
PROVIDED SCREWS. GRILLE MAY BE
PAINTED IF DESIRED.

OUTER SLEEVE
ELECTRICAL RELIEF SLOT

IMPORTANT: IF ASLL OUTER SLEEVE WILL BE
EXPANDED OVER 13”, AIR FLOW LEAKAGE
STICKERS MUST BE APPLIED OVER ELECTRI-
CAL RELIEF SLOT TO PREVENT AIR LEAKAGE.

DIAGRAM K1

APPLY
STICKERS
OVER
RELIEF
SLOT IF
EXPAND
OVER 13”

RELIEF
SLOT

DIAGRAM I1

PUSH WIRE UP TIGHT AGAINST ASLL BLOWER
HOUSING AND INSERT THE ASLL THROUGH
FLOOR OPENING.

DIAGRAM J1

INSTALL SHEETROCK BRACKETS ON BOTH
ENDS OF OPENING WITH LARGER HOLES IN
BRACKETS FACING DOWN.

DIAGRAM H1

SNAP PROVIDED STRAIN RELIEF BUSHING
INTO ASLL ELECTRICAL BOX WITH 6-8” OF
WIRE IN ELECTRICAL BOX.

Advertising