Tycon Power UPS-ST2424-50-UBNT User Manual

Page 4

Advertising
background image

4

troller to the back green connector on the 5 port switch. You can use

the included cable with terminal connectors by cutting off terminal con-

nectors and then cutting and stripping cable to proper length. Observe

proper polarity for all connections.

Note: There are two +V and two V- (GND) connections on the controller

and the switch. You can use either connection. The FG connection is

for frame ground or earth ground. If your grounding scheme requires it

you can connect the FG to the enclosure ground point near the bottom

of the door. The FG is common to the RJ45 shield.

TP-SCPOE Controller

TP POE Switch

STEP 9: Install the batteries in the enclosure. Batteries are 12V

batteries and need to be connected in series for 24VDC output.

24V two batteries and 24V four batteries configurations are shown here:

Advertising