Tycon Power UPS-DC1212-9 User Manual

Page 3

Advertising
background image

3

STEP 7:

Mount any electronics boards to the metal plate. Install a

CAT5 cable between the controller POE OUT and the electronics.

There is a secondary voltage

output on the back of the control-

ler which can be used in addition

to the POE OUT. The secondary

output is equal to the battery

voltage.

On the bottom of the enclosure

there are double D cutouts for

standard N Female bulkhead

connectors which can be used

for an external antenna or RF

device. Just remove the hole

plug to use these cutouts.

STEP 8: Tighten the RJ45 Feedthru on the Cat5 cable. If the cable di-

ameter is too small to make a good seal, wrap a couple turns of electri-

cal tape around the CAT5 cable at the seal area to increase it’s diame-

ter.

STEP 9: Make sure lid gasket is clean and free from any particles, then

carefully close the cover, making sure that wires are clear of the seam

and hinge area.

STEP 10: Tighten the 4 seal screws evenly to seal the cover. Use a

grease or oil on the 4 cover attached screws to make it easier to re-

move later.




POE-IN of

controller

Device 1

Device 2

FG = Frame Ground (Do Not Connect to

V-)

GND = V- (There are two V– connec-

tions:1 and 2)

+12V or +24V = V+ (There are two V+

connections: 1 and 2)

+

-

Advertising