Welch Allyn 777 40 Wall Panel Instructions - Installation Guide User Manual

Installation instructions, 40" integrated panel with diagnostic system

Advertising
background image

Installation

Instructions

40" Integrated Panel With
Diagnostic System

Unpacking Notes

Concealed Damage.

If there should be damage of

such nature that it could not be detected until the
goods were unpacked, have the Transportation
Company's Agent come AT ONCE and inspect
them. Require them to give you a "concealed" bad
order report stating the condition of the goods
when examined. It is their duty to do this and you
should INSIST upon it.



If the Above Instructions are Complied With

, we

shall cheerfully render all possible assistance in
establishing claims against the Transportation
Company for loss and damage in transit.



We Do Not Accept Goods Returned For Credit,
Exchange, Repairs

, or for any other reason,

unless you have first communicated with us and
secured our written permission.

Installation

NOTE

The Integrated Panel is mounted to the wall using
steel mounting brackets (provided with the unit). Wall
anchors and drywall screws are also provided to
secure the mounting bracket to the wall. Figures 1
and 2 are suggested mounting configurations and
locations only.

1.

Using the customer or room layout drawing,

determine where the Integrated Panel will be
located. See Figure 1 for the suggested room
layout.

2.

Measure and mark the mounting location of the

mounting bracket on the wall. See Figure 2.

3.

Locate and mark the location of studs in reference

to mounting bracket; an electronic stud finder may
be useful.

NOTE

This note applies to steps 4 thru 6. When securing
mounting brackets to a wall with metal studs, use
sheet metal screws in place of drywall screws and
when securing mounting brackets to a masonry /
concrete block wall, use masonry screws in place of
drywall screws and wall anchors.

4.

Place the mounting bracket in position on wall and

mark the locations of all fasteners. Remove the
mounting bracket and drill a 3/8 in. hole where all
wall anchors are to be used; four holes per mount-
ing bracket if a wall stud is not located and three
holes per mounting bracket if a wall stud is
located.

5.

Install a wall anchor in each hole. Install a screw

in each wall anchor and tighten far enough to
secure the wall anchor in place. Then, remove all
screws from the wall anchors.

6.

Attach mounting bracket to the wall using wall

anchor screws. Level the mounting bracket before
securing to the wall.

7.

Test mounting bracket for strength.

8.

Mount the instruments to the Integrated Panel as

follows using Figure 3 or 4 to properly position the
instruments:
Position the Aneroid Blood Pressure Unit on the
single screw provided and then secure top of unit
in place using two of the five additional screws
provided. Position and secure the hanging basket
with the three remaining screws. Install (hang) the
remaining instrument assemblies on the pre-
installed mounting screws.

9.

Lift the Integrated Panel onto their mounting

bracket.

© Midmark Corporation - 1999

®

Sheet 1 of 2

Advertising
Table of contents