Sheet2, Drawing view178, Drawing view185 – AVF MWC84 User Manual

Page 2: Drawing view206, Drawing view207, Drawing view209, Drawing view210, Drawing view211, Drawing view212, Drawing view213

Advertising
background image

Step 5

Install and Setup shelves

Cable

Passage

Step 6

A)Position mount or item on panels. (across both panels if possible)

B)Mark hole locations with pencil.

C)Drill holes using 11/32 drill bit.

D)Open bracket mount Bag.

Pass 8mm Bolts through bracket. (drill holes larger if required)

Place large fender washer and Nut and tighten with wrench.

Door Hidden

for Visibility.

Example

bracket not

included.

VIDEO FURNITURE INTERNATIONAL

190 Don Hillock Drive Aurora , Ontario L4G 0G9 www.video-furn.com

Toll Free: 1-877-834-3876 Fax: 1-905-751-1488 Local:905-751-1459

Attaching Uprights and feet.

Page 2

of 2

Attaching Panels and mounting items

Step 4

Insert first panel from top into tracks.

Make sure to hold uprights together

before inserting screws.

Repeat with second panel.

Step 3

Set the Cabinet with doors facing up.

Insert Carriage bolts through all

3 pieces and a nut from the bottom.
Once all 6 are tight. stand unit up.

End

Advertising