Bradford White U-65T-55FR-3N User Manual

Page 19

Advertising
background image

At periodic intervals (not more then 6 months) a visual inspection should be made of the main burner for proper operation

and to insure no debris is accumulating.

Main burner should light smoothly from pilot and burn with a blue flame with a minimum of yellow tips. After 5 minutes

of operation the burner screen will become radiant and the flame will soften and turn orange. If the burner screen does not

become radiant after 5 minutes of operation it must be cleaned (see burner cleaning procedure below).

Main burner must be free from any debris accumulation that may effect burner operation (see burner cleaning procedure

below).

MAIN BURNER: Inspection,

Cleaning and Replacement

DANGER

Under no circumstances shall flammable materials be used or stored in the vicinity of the water heater. With

the inner door removed the Bradford White Defender Safety System will be inactivated. If flammable vapors

are present, a fire or explosion may result causing property damage, personal injury or death.

SERVICE PROCEDURE ED-VI

Burner Operation Inspection,

Cleaning and Replacement

WARNING

Inner door and burner components may be HOT when performing this operation. Take

necessary precaution to prevent personal injury.

Page 19

BURNER CLEANING

Step 1.

Remove burner and inner door assembly per SERVICE PROCEDURE ED-I, steps 1 through 3g.

Step 2.

Remove manifold mount from burner inner door by removing (2) ¼” hex drive screws.

Step 3.

Thoroughly inspect burner screen and burner venturi and remove any loose debris accumulation. Inspect

burner screen for any openings larger than the normal screen openings.

Step 4.

Use compressed air and/or a vacuum to remove any scale or other debris accumulation from the burner screen

and venturi.

Burner Screen

¼” Hex Drive Screws

Burner Venturi

19

Advertising