Assembly instructions step 1: step 2 – Outdoor Great Room Tuscany II-WB Pergola User Manual

Page 4

Advertising
background image

4

Assembly Instructions

Step 1:

Step 2:

Set Columns (A) into position as shown. Do not
anchor to a surface until all beams have been
assembled and squared. See page 9 for
information regarding concrete anchoring method.

Place header beams (F) on top of columns in

the desired orientation and center and square
them parallel to each other and square with
the columns.

193” (outside corners)

136 7/8” Outside edges

* footprint is
square

Advertising