Rotary spreaders - assembly instructions – Cub Cadet 80 LB User Manual

Page 7

Advertising
background image

7

Rotary Spreaders - Assembly Instructions

Hopper and Frame

Handle Grips

Handle

On/Off Lever

Operating Lever

Rod

Lower
Handle

Leg

1. Remove the spreader components from the

carton. You should find all of the parts shown
above plus the Hardware Package. The
Hardware Package contains:

1

C-Clip

1

Calibration Gauge (ODD)

1

Calibration Gauge (EVEN)

1

Calibration Gauge Chain

1

Clevis Pin, 1/4 x 1/2

1

Cotter Pin, 3/32 x 1

1

Hex Nut, 5/16-18

1

Hex Nut, 5/16-18, Nylock

1

Lock Washer, 5/16

4

Hex Head Machine Screw, 1/4-20 x 2”

4

Machine Screw, 1/4-20 x 1-1/2"

4

Hex Screw, 1/4-20 x 3/4”

12 Nylock Nut, 1/4-20

2. Install the leg to the hopper and frame assembly

by fastening with 4 hex head machine screws,
1/4-20 x 2 and 4 locknuts, 1/4-20.

3. Attach the lower handle to the frame (with the “V”

section of the closed section of the handle facing
down) using 4 hex head screws, 1/4-20 x 3/4,
and 4 nylock nuts, 1/4-20. nuts, 1/4-20.

4.

Attach the upper handle to the lower handle (with
the on/off bracket lugs facing up) using 4 machine

screws, 1/4-20 x 1 1/2 and 4 nylock nuts, 1/4-20.

5. Fasten the on/off lever to the handle's bracket

lugs using the clevis pin in the bottom hole of the
lever. Insert the clevis pin from left to right, facing
the rear of the hopper. Lock with the 3/32 x 1/2
cotter pin.

6. Attach the operating lever rod to the pivot lever

assembly at the bottom-rear of the hopper. First
screw the 5/16 hex nut on the threaded end of
the operating lever rod, add the 5/16 lock
washer, then insert the rod through the hole in
the pivot lever assembly and install the 5/16
locknut.

7. Attach the operating lever rod to the on/off lever

by inserting the bent end of the rod into the top
hole of the lever from left to right and install the
C-clip.

8. Pull the on/off lever to the off position and move

the shutoff plate assembly to the fully closed
position by adjusting the 5/16 hex nuts on the
bottom of the operating lever rod.

9. Place the handle grips on the handles.
10. Grease the axle bearings and the gear support.
11. Read the Spreader Calibration instructions

packed with your spreader and calibrate
following the instructions.

Advertising