Ppp configuration, Internal t1 csu/dsu (wan 0) link configuration, Required for dedicated line operation – Compatible Systems 2270R User Manual

Page 29: Suggested for dedicated/leased line operation, Rs-232 (wan 1) link configuration, Required for dedicated/leased line operation, Required for dial-on-demand operation

Advertising
background image

Chapter 6 - Basic Configuration Guide

23

PPP Configuration

This section covers the settings required for PPP (point-to-point)
protocol operation of the WAN interfaces.

Internal T1 CSU/DSU (WAN 0) Link Configuration

Required for Dedicated Line Operation

This is the only mode of operation supported via the built-in T1
CSU/DSU.

Set PPP connection

CV: Use the Link Configuration: WAN 0 Dialog Box.

TB: Use configure and set the Mode keyword in the Link Config

WAN 0 section.

Suggested for Dedicated/Leased Line Operation

Dedicated line operation generally does not require additional parame-
ters for operation.

RS-232 (WAN 1) Link Configuration

Required for Dedicated/Leased Line Operation

Dedicated line operation is the simplest to set up.

Set Dedicated connection

Set PPP connection

CV: Use the Link Configuration: WAN 1 Dialog Box.

TB: Use configure and set the Mode and ConnectMode keywords in

the Link Config WAN 1 section.

Suggested for Dedicated/Leased Line Operation

Dedicated line operation generally does not require additional parame-
ters for operation.

Required for Dial-On-Demand Operation

This mode of operation is only supported on the WAN 1 RS-232 inter-
face. Incoming dial-on-demand operation requires only slightly more
information than dedicated line setup. Outgoing dial-on-demand
requires additional information (see the suggested settings below).

Set dial-up connection

Set PPP connection

Advertising