Installation Guidelines

W A T E R W O R K S

Waterworks is a registered trademark of Waterworks Inc.

04.11.07

PTSV47 (trim) & GUSV16R (rough)

PTSV48 (trim) & GUSV16R/17R (rough)

2

1

2

"

2

3

8

2

3

8

"

3

1

8

"

2

1

2

"

2

3

8

.25 Wall Valve Trim

FIGURE 1

1

2

3

4

IMPORTANT

To ensure this product is installed properly, you

must read and follow these guidelines.

The owner/user of the valve must keep this

information for future reference.

Valve body rough-in depth is 3" from the centerline

of the inlets to the face of the finished wall. The

valve must be installed according to the flow direction

arrow marked on the side of the wall valve body.

Be sure your installation conforms to local codes.

Wall valves control on/off/volume and must be

installed for each fitting that will have water flowing to
it. If using a wall valve with our thermostatic valve,
refer to the Installation Guidelines for the

Thermostatic Valve which contains related installation

information.


Refer to the specification and assembly drawings

attached. Shower trim and valves are sold partially
assembled but shown fully disassembled for illustrative
and service purposes only.

This valve should be on-site prior to rough in and

allows the installer to visualize the installation.

Inspect this product to assure you have all parts

required for proper installation.

Use only a strap wrench or protected/smooth-jaw

wrench on any finished surface.

ROUGH IN:

REQUIRED: Ideal valve body rough-in depth is 3" from

the centerline of the inlets to the face of the finished
wall.

1. Remove the tile shield (4) and unthread the threaded

sleeve (3) from the valve body assembly (1,2).

2. If soldering any connections, remove the cartridge (2)

to prevent damage to seals.

3. For each fitting that will have water flowing to it, install

a wall valve according to the flow direction arrow
marked on the side of the wall valve body.

4. Run

3

4

" copper supply lines to the proper height of the

valve inlets and be sure to secure all piping and fittings.

Install the valve at a height and spread (if applicable)

that is comfortable to the user.

5. Reinstall the cartridge and threaded sleeve making sure

the tile shield is attached.

6. Turn on the supplies and check for leaks.

ATTACH THE TRIM:
7. Pull the tile shield (4) off the threaded sleeve (3).

8. Thread the handle trim connector onto the handle.

This product must be installed by a professional

contractor.

9. Thread the handle trim connector and handle onto

the threaded trim sleeve (3).

These guidelines have been prepared for the professional contractor to aid in the installation of:

.25 WALL VALVE TRIM WITH CROSS HANDLE (PTSV47) & LEVER HANDLE (PTSV48)

All dimensions are based on original specification and are subject to change and variation. Please consult
your Design Associate for current specifications.

3"

3"

Advertising
This manual is related to the following products: