Waterworks Boulevard Volume Control Valve Trim with Metal Cross Handle User Manual

Installation guidelines

Advertising
background image

Boulevard Cross Handle Wall Valve And Trim

11/02

W A T E R W O R K S

These guidelines have been prepared for the professional contractor to aid in the installation of:
BOULEVARD CROSS HANDLE WALL VALVE AND TRIM
(GUSV12R & BDSV47)

All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.

Installation Guidelines

1

NOTES:

➢ Use only a protected, smooth-jawed, or strap wrench on any finished

surface.

ROUGH-IN:

➢ Install the valve with the water flowing in the direction indicated.

➢ IMPORTANT:Valve rough-in is 2

1

2

" from the centerline of the supplies

to the face of the finished wall.

➢ Separate supply stop valves, which will facilitate servicing should be

installed in an accessible location.

FINISH:

➢ Screw on trim and measure from the base of the escutcheon to the

finished wall. Remove the trim and retain this measurement.

➢ Cut the valve stem and threaded sleeve so that the trim becomes flush

with the finished wall.

➢ The amount cut from the valve stem and threaded sleeve should be the

same as the distance measured in the previous step.

➢ Reattach the trim and check to ensure it is flush with the finished wall. If

necessary, cut the valve stem and threaded sleeve further to make flush.

➢ Carefully turn on the water supply and check all connections for leaks.

➢ If further assistance is required, please contact Product Support at

1-800-927-2120 (8am-7pm EST).

1

2

"

2

1

8

"

3"

11

16

"

2

1

2

"

ø 2

1

2

"

Note:

3

4

" NPT

GUSV12R (rough) & BDSV47 (trim)

Figure 1

Handle

Escutcheon

Valve

Threaded Sleeve

Valve Stem

Advertising