Waterworks Amelie Deck Mounted High Profile Concealed Tub Filler with White Porcelain Handshower and Metal Lever Handles User Manual

Installation guidelines

Advertising
background image

Amelie Concealed Tub Filler With Lever Handles

7/03

W A T E R W O R K S

These guidelines have been prepared for the professional contractor to aid in the installation of:
AMELIE CONCEALED TUB FILLER WITH LEVER HANDLES
AMTU10)

All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.

Installation Guidelines

Figure 2

Index Ring

Index

Washer
Handle Screw

Handle

Stem Extension

Cover

Escutcheon

Escutcheon Gasket

Lower Gasket

Metal Washer

Locking Nut

Valve Body

Washer

Valve Stem

1

Escutcheon

Escutcheon gasket

Gasket

Metal washer
Locking nut

Figure 1

Figure 3

Aerator

Aerator

housing

Tee

assembly

Locknut

Metal

washer

Escutcheon

Spout

Gasket

Escutcheon

washer

Lift

rod

3

7

/

8

"

1

3

/

4

"

1

7

/

8

"

max

9

1

/

2

"

Ш

2

1

/

4

"

Ш

2

1

/

4

"

3

3

/

8

"

10" - 12"

9

1

/

8

"

5

7

/

8

"

Ш

2

3

/

4

"

10"

3

/

4

" male

NPT

72" hose

23

5

/

8

" long

flow restrictor/non-return valve

1

7

/

8

"

max

Notes:
• Drilling holes sizes:
spout and handshower: 1

1

/

4

"

side valves: 1

1

/

2

"

• Must have an access panel for servicing
• Consult your local building codes for
anti-scald requirements

NOTES

➢Use only a protected, smooth-jawed, or strap wrench on any finished surface.

➢For proper installation, the deck surface should be installed prior to mounting

the mixer.

➢It is recommended that an access panel be provided for future servicing.

➢Check the specifications (left) for drilling hole sizes.

➢Run

3

/

4

"

supply lines for maximum water flow.

➢Accessible shut-off valves, which will facilitate servicing, are recommended for

the hot and cold feed lines.

➢DO NOT use putty on deck fittings. Upper gaskets are provided.

INSTALLATION

➢ To remove the trim from the valve body,unscrew the metal index ring and

remove the porcelain index and washer exposing the handle screw (fig.1)

➢ Loosen and remove the handle screw and lever handle.Then, remove the

stem extension, cover, and escutcheon.

➢ Insert the valve body through the mounting hole and screw the escutcheon

and cover down until until the cover is fully seated.Then, tighten the bottom
locking-nut to secure the valve to the deck. Repeat for the other valve
assembly.

➢ Re-attach the handle trim assemblies.

➢ Remove the locking nut, gasket and tee assembly from the spout shank and

insert spout through the mounting hole. Please note that the diverter lift knob
must be unthreaded before removing the tee assembly. (see fig. 2).

➢ Re-attach the locking nut and gasket to spout shank and tighten until spout is

fully secured.Then re-attach the tee assembly and diverter lift knob.

➢ Install the flexible supply hoses between the valve bodies and the tee

assembly.

MOUNTING THE HANDSHOWER ESCUTCHEON
(see fig.3)

➢ Remove the locking nut and gaskets from the handshower escutcheon

assembly, and insert through the mounting hole.Then, re-attach and tighten
the locking nut until fully secured.

➢ Connect the knurled end of the hose to the bottom of the tee assembly using

the gasket provided.

➢ Connect the hot and cold water supplies to the side valve bodies.

➢ After installation, unscrew and remove the aerator assembly. Carefully open

the hot and cold valves to fully flush out any debris in the supply lines. Once
the lines have been flushed, close the valves and re-install the aerator
assembly.

➢ IMPORTANT: Check for leaks and ensure the unit is functioning properly

before closing the access panel.

➢ If further assistance is required, please contact Product Support at:

1-800-927-2120 (8AM-7PM EST).

AMTU10

Advertising