Waterworks Easton Classic Low Profile Concealed Tub Filler With Handshower and White Porcelain Lever Handles User Manual

Installation guidelines

Advertising
background image

2

3

/

8

"

3"

5"

1

5

/

8

"

max

2"

max

3

3

/

4

"

3"

max

6"

10"

8

1

/

2

"

2

1

/

4

"

24" hose

78" hose

3

/

4

" NPT

3

1

/

2

"

3

3

/

4

"

Ш

2

3

/

8

"

3

1

/

2

"

3

3

/

4

"

Ш

2

3

/

8

"

EATU02-K

EATU03-K, 04-K, 05K

Notes:

• Inlets are

3

/

4

" straight

male thread - NPT
adaptors provided

• Drilling hole size: 1

1

/

2

"

• Must have access panel

for servicing.

• Consult your local

building codes for
anti-scald requirements.

Easton

®

Concealed Tub Filler with Hand Shower - Covered

These guidelines have been prepared for the professional contractor to aid in the installation of:
EASTON

®

CONCEALED TUB FILLER WITH HAND SHOWER (COVERED)

(EATU01, 02-K, 03-K, 04-K, 05-K)
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.

Installation Guidelines

1

W A T E R W O R K S

®

12/24

COVERED
EATU01
(CROSS HANDLE)
EATU02-K (METAL LEVER HANDLE)
EATU03-K (WHITE PORCELAIN LEVER HANDLE)
EATU04-K (BLACK PORCELAIN LEVER HANDLE)
EATU05-K (OAK LEVER HANDLE)

INSTALLATION GUIDELINES:

IMPORTANT:

➢ T

To

o e

en

nssu

urre

e tth

hiiss p

prro

od

du

ucctt iiss iin

nssttaalllle

ed

d p

prro

op

pe

errllyy,, yyo

ou

u m

mu

usstt rre

eaad

d aan

nd

d

ffo

ollllo

ow

w tth

he

esse

e ggu

uiid

de

elliin

ne

ess..

➢ T

Th

he

e o

ow

wn

ne

err//u

usse

err o

off tth

he

e ffaau

ucce

ett m

mu

usstt kke

ee

ep

p tth

hiiss iin

nffo

orrm

maattiio

on

n ffo

orr

ffu

uttu

urre

e rre

effe

erre

en

ncce

e..

➢ B

Be

e ssu

urre

e yyo

ou

urr iin

nssttaallllaattiio

on

n cco

on

nffo

orrm

mss tto

o llo

occaall cco

od

de

ess.. IItt iiss tth

he

e

rre

essp

po

on

nssiib

biilliittyy o

off tth

he

e p

pllu

um

mb

be

err tto

o p

prro

ovviid

de

e aan

nttii--ssccaalld

d p

prro

otte

eccttiio

on

n..

➢ A

Acccce

essssiib

blle

e ssh

hu

utt--o

offff vvaallvve

ess,, w

wh

hiicch

h w

wiillll ffaacciilliittaatte

e sse

errvviicciin

ngg,, aarre

e

rre

ecco

om

mm

me

en

nd

de

ed

d ffo

orr tth

he

e h

ho

ott aan

nd

d cco

olld

d ffe

ee

ed

d lliin

ne

ess..

➢ A

An

n aacccce

essss p

paan

ne

ell iiss n

ne

ecce

essssaarryy ffo

orr ffu

uttu

urre

e sse

errvviicciin

ngg..

➢ IInnssppeecctt tthhiiss pprro

od

du

ucctt tto

o aassssu

urre

e yyo

ou

u h

haavve

e aallll p

paarrttss rre

eq

qu

uiirre

ed

d ffo

orr

p

prro

op

pe

err iin

nssttaallllaattiio

on

n..

➢ U

Usse

e o

on

nllyy aa ssttrraap

p w

wrre

en

ncch

h o

orr p

prro

otte

ecctte

ed

d//ssm

mo

oo

otth

h--jjaaw

w w

wrre

en

ncch

h o

on

n

aan

nyy ffiin

niissh

he

ed

d ssu

urrffaacce

e..

➢ R

Ru

un

n 3

3//4

4"" ssu

up

pp

pllyy lliin

ne

ess ffo

orr m

maax

xiim

mu

um

m w

waatte

err ffllo

ow

w..

➢ D

Do

o N

NO

OT

T u

usse

e p

pu

uttttyy d

du

urriin

ngg tth

hiiss iin

nssttaallllaattiio

on

n..

➢ R

Re

effe

err tto

o tth

he

e ssp

pe

ecciiffiiccaattiio

on

n aan

nd

d aasssse

em

mb

bllyy d

drraaw

wiin

nggss aattttaacch

he

ed

d..

FFaau

ucce

ett iiss sso

olld

d p

paarrttiiaallllyy aasssse

em

mb

blle

ed

d b

bu

utt ssh

ho

ow

wn

n ffu

ullllyy d

diissaasssse

em

mb

blle

ed

d

ffo

orr iillllu

ussttrraattiivve

e aan

nd

d sse

errvviicce

e p

pu

urrp

po

osse

ess o

on

nllyy..

SIDE VALVE INSTALLATION:
1. With the lock nut (15) and lower sealing gasket (14) installed

on the side valve (13), insert the side valve into the hole in
the mounting surface so at least 1" of threads are exposed
above the deck surface.

2. Place the upper sealing gasket (11) onto the side valve then

thread the base escutcheon (10) onto the side valve.

3. Thread the handle assembly (1-9) onto the side valve until it

stops. Hand tight is adequate; if this assembly is too tight, the
handle will bind.

4. Unthread the base escutcheon until it contacts the gland nut

(6), which will assure proper side valve height.

5. Tighten the lock nut up against the underside of the

mounting surface to secure the side valve.

6. Repeat these steps to install the second side valve.

SPOUT INSTALLATION:
7. Unthread the diverter tee (32), locking nut (30) and lower

washer (29) from the spout (19).

8. Insert the spout assembly (17-28) through the hole in the

mounting surface with the upper washer (20) positioned
under the spout.

9. Reinstall the lower washer and tighten the locking nut to

secure the spout to the mounting surface.

10. Reattach the tee to the spout and fully tighten to prevent

leaks.

HAND SHOWER INSTALLATION:
11. Unscrew the locking nut (37) from the all-thread (42) and

remove the lower washer (38).

12. Unscrew the cover ring (44) from the all-thread and pull out

the plastic guide (43).

13. Insert the all-thread through the mounting surface, leaving

the escutcheon (41) and upper washer (40) in place.

14. Re-attach the lower washer and locking nut to the all-thread.

Fully tighten the locking nut to secure the assembly.

15. Slide the cover ring (44) over the conical end of the hose (36)

and insert the hose into the plastic guide (43). Now pass the
knurled end of the hose (36) through the all thread (42) until
the plastic guide is fully seated inside of the all-thread. Finally, re-
attach the cover ring to the all-thread.

16. Connect the conical end of the hose to the hand shower.

Note:The combination flow restrictor/non-return valve (45)
is located in the end of the hand shower.Final Connections
and Inspection

Advertising