Wilbur Curtis CBP User Manual

Service manual – combo brewer w, Ilbur, Urtis

Advertising
background image

1

Important Safeguards/Conventions

This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be performed by an

authorized service technician.

• Do NOT immerse the unit in water or any other liquid

• To reduce the risk of fire or electric shock, do NOT open top or front panel. No user serviceable parts inside.

• Keep hands and other items away from hot parts of unit during operation.

• Never clean with scouring powders, bleach or harsh chemicals.

Symbols

WARNINGS – To help avoid personal injury

Important Notes/Cautions – from the factory

Sanitation Requirements

Your Curtis Combo Brewer is Factory Pre-Set and Ready to Go… Right out of the Box.

Following are the Factory Settings for your Coffee/Tea Brewing System:

• Brew Temperature = 204°F

• Brew Volume = Set to dispensing vessel requirements

(2.2 liters)

Generally there will never be a reason to change the G3/Gold Cup Series default settings. However, should you need to make slight

adjustments to meet your brewing needs, programming instructions are provided later in this manual.

System Requirements:

• Water Source 20 – 90 PSI. Minimum flow rate of ½ gpm (1 gpm preferred flow rate).

• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model.

Equipment to be installed to comply with applicable federal, state, or local plumbing/electrical codes having jurisdiction.

SETUP STEPS

The unit should be level (left to right and front to back) and located on a solid counter top. Connect a water line from the water filter to the

brewer.

NOTE: Some type of water filtration device must be used to maintain a trouble-free operation. (In areas with extremely hard water, we

suggest that a sedimentary and taste & odor filter be installed.) This will prolong the life of your brewing system and enhance coffee and

tea quality.

1. A 1/4” Flare has been supplied for water line connection. Use tubing sized sufficiently to provide a minimum of ½ gpm (1 gpm is

preferred).

2. Connect the unit to an appropriate electrical power circuit.

3. Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to fill. When the water level in the tank rises

to the correct volume, the heating element will energize automatically. With the G3/Gold Cup Series there is no danger of element

burnout due to an unfilled heating tank.

4. The heating tank will require 20 to 30 minutes to reach operating temperature (204°F) as indicated by the READY-TO-BREW

LCD readout.

5. Important: Run one full TEA brew cycle first, before running a coffee brew cycle to purge water lines and valves of air. Five

seconds of pulsing dilution water at the beginning of each TEA brew cycle is normal pre-programmed operating behavior.

NSF International requires the following water connection:

1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be moved for cleaning

underneath the unit.

2. This equipment is to be installed with adequate back flow protection to comply with applicable federal, state and local codes..

3. Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed and maintained in

accordance with federal, state, and local codes.

CAUTION: Please use

this setup procedure

before attempting to use

this brewer. Failure to follow the

instructions can result in injury or the

voiding of the warranty.

CAUTION: DO NOT

connect this brewer to hot

water. The inlet valve is

not rated for hot water.

IMPORTANT: After

setup, run a full TEA

cycle first before running

a COFFEE cycle. Place an empty

tea container to catch both hot water

from the brew cone and dilution

water from spout on the front cover.

Models:

• CBS

• CBP

WARNING HOT LIQUID,

Scalding may occur.

Avoid splashing.

4. Pour ground

coffee into

brew cone

marked

COFFEE

6. Press the

COFFEE

Brew button.

5. Position

filled brew

cone into

brew rails.

BREWING INSTRUCTIONS – COFFEE

1. Ready-to-Brew should be displayed on the UCM screen.

2. Make sure that the folding airpot deck is in the proper position to accommodate your airpot. Place a clean, empty airpot on the deck.

3. Place a new paper filter into the brew cone.

FOR THE LATEST SPECIFICATIONS AND INFORMATION GO TO WWW.WILBURCURTIS.COM

C

ISO 9001:2008 REGISTERED

WILBUR CURTIS CO., INC.

6913 West Acco Street

Montebello, CA 90640-5403

For the latest information go to

www.wilburcurtis.com

Tel: 800-421-6150

Fax: 323-837-2410

Service Manual – Combo Brewer

W

ilbur

C

urtis

C

ompany

, i

nC

.

Advertising