Each compartment has capacity for: • three 2 – Cleveland Range 24CGA6.2S User Manual

Page 2

Advertising
background image

GAS

ELECTRIC

COLD WATER

CLEARANCE

DRAINAGE

1

1

4

˝ IPS line size,

3

4

˝ connection

120V-1Phase, 60 Hz.

35 psi minimum

RIGHT = 12.00˝

NATURAL

PROPANE

BTU

2 Blowers & Controls

60 psi maximum

LEFT = 3.00˝

Piping

3

4

˝ N.P.T.

Piping

3

4

˝ N.P.T.

50,000 each

150 watts each

C2

3

8

˝ dia. NPT for Generator

REAR = 3.00˝

Supply pressure

Supply pressure

Generator,

C1

3

8

˝ dia. NPT for Condenser

Allow 6˝ space min.

4.50˝ W.C. Min.

11.00˝ W.C. Min.

100,000 total

** Do not connect to GFI

from rear and sides

14.00˝ W.C. Max.

14.00˝ W.C. Max.

outlet. See note below.

When located near
combustible walls

Manufacturer must be notified if unit will

be used above 2,000 feet

20.63"

(524mm)

33.13"

(842mm)

4.87"
(124mm)

3.00" TYP
(76mm)

7.75"

(197mm)

10.44"

(265mm)

5.00"

(127mm)

4.00"

(102mm)

12.00"

(305mm)

24.00"

(508mm)

12.76"

(324mm)

15.06"

(383mm)

17.43"

(443mm)

37.13"

(943mm)

13.25"

(337mm)

10.00"

(254mm)

20.88"

(530mm)

4.75"

(121mm)

13.88"

(353mm)

20.36"

(517mm)

17.25" TYP

(438mm)

21.50"

(546mm)

59.21"

(1504mm)

30.25"

(768)

5.00"

(127mm)

7.34"

(186mm)

20.50"

(521mm)

2.06"

(52mm)

6.60"

(168mm)

33.13"

(842)

6.13"
(156mm)

24.00"

(610mm)

OPERATING
CLEARANCE

SECONDARY
CLEARANCE

C2

D

C1

(NOT TO SCALE)

SECT.

IV

PAGE

12

1007

Litho in U.S.A.

Each Compartment has

Capacity for:

• Three 2

1

2

˝ x 12˝ x 20˝

Steam Table Pans

• Six 1˝ x 12˝ x 20˝

Steam Table Pans

• Two 4˝ x 12˝ x 20˝

Steam Table Pans

C

NOTES:

**DO NOT CONNECT TO GFI OUTLET. CLEVELAND RANGE RECOMMENDS GAS FIRED 120 VOLT STEAMERS BE HARD WIRED DIRECTLY TO ELECTRICAL SYSTEM.

Cleveland Range reserves right of design improvement or modification, as warranted.

Many regional, state and local codes exist and it is the responsibility of the owner and installer to comply with the codes.

Cleveland Range equipment is built to comply with applicable standards for manufacturers. Included among those approval agencies are UL/NSF#4 and CSA (AGA, CGA).

D

WATER QUALITY

REQUIREMENTS

The quality of water varies

greatly from region to

region. Steam equipment

generators

must

be

drained daily and chemi-

cally descaled periodically

to ensure proper operation.

To minimize service prob-

lems caused by the accu-

mulation of minerals and

chemicals in water review

the following quality guide-

lines with a local water

treatment specialist. Inlet

water that is beyond these

specified guidelines should

be treated to achieve these

acceptable limits. Total

Dissolved Solids less than

60 ppm, Alkalinity less than

20 ppm, Silica less than 13

ppm, pH factor greater

than 7.5, Chlorine less

than 30 ppm.

Right - 3”, Left - 3”,

Rear - 3”
(12” on control side if

adjoining wall or

equipment is over 30”

high for service access)

Contact factory

for variances to

clearances.

1

1

2

˝ dia.

Do not connect other units to this

drain
Drain must not be located

beneath the steamer itself
Preferred floor drain location

should be a minimum distance

(from the unit) of at least 12” from

the left side, 12" from the right

side, 6” from the front and 6" from

the rear
Do not use PVC pipe