Assembly of the upper rod into gear box, Setting guide, Parts list – OFNA Racing Buggy Pivot Ball Kit User Manual

Page 2

Advertising
background image

Assembly of the right and left hand side
are the same.

3mm
Nylon Lock
Nut

3 x 25mm
Cap Screw

* Insert into rear hub.

30061
4 x 25mm
Flat Head Screw

4mm
Nylon
Lock Nut

ASSEMBLY OF THE UPPER ROD INTO GEAR BOX

0

0

0

0

A

A

B

B

C.L

C

C'

SETTING GUIDE

REAR WIDTH SETTING

REAR CAMBER SETTING

Adjust A and B to the same

.

Adjusting B longer will make the rear tires
toe-in (Positive).

Adjusting A longer will make the rear tires
toe-out (Negative).

length

* Use a 2.5mm hex wrench to adjust
the rear track width.

The rear camber adjustment can be make by changing the length
of the upper rod.

Making the upper rod longer will make the camber positive.
Making the upper rod shorter will make the camber negative.

+

+

+

+

-

-

Upper Rod

-

-

PARTS LIST

Item No.

Description

Qty

Front Lower Arm 1 set

#36690 7mm Ball End 4 pcs

#36850 7mm Ball 4 pcs

#36880 5X60 Turnbuckle 2 pcs

#31307 Pivot Ball 2 pcs

#36890

Item No.

Description

Qty

#36082 Rear Wheel Axle Shaft 2 pcs

#31303 Rear Lower Arm 1 set

#31304 Rear Hub (Pivot Ball Type) 2 pcs

#31305 Ball Washer 4 pcs

#31306 Alum. Hex Nut 4 pcs

#36054 Wheel Drive Nut 2 pcs

#36503 8x16x5mm Ball bearings 8 pcs

#36055 2.5x17mm Drive Pin 4 pcs

#34010 9mm Upper Arm Ball End 2 pcs

#30092 9mm Ball and Socket 2 pcs

ASSEMBLE THE FRONT AND REAR GEAR BOX ONTO CHASSIS AS USUAL.

Advertising