Talkaphone ETP-MT-72 Emergency Phone Tower User Manual

Etp-mt anchor bolt installation instructions

Advertising
background image

ETP-MT Anchor Bolt Installation Instructions

Copyright 2009 Talk-A-Phone Co. All rights reserved.


Talk-A-Phone Co.

• 7530 North Natchez Avenue • Niles, Illinois 60714-3804

Rev. 9/16/13

Phone 773.539.1100 • Fax 773.539.1241 • [email protected] • www.talkaphone.com

All prices and specifications are subject to change without notice.

Talk-A-Phone, Talk-A-Lert, Scream Alert and WEBS are registered trademarks of Talk-A-Phone Co.


I.

Introduction


Note: This manual is for anchor bolt installation only. For instructions on installing the tower onto the anchor bolts,
see the ETP-MT Tower Installation Instructions.

II.

Contents


Before beginning installation, make sure you have all the included components. Each Tower consists of three
packages. Package #1 is the anchor bolt kit labeled MT BOLT KIT. Package #2, is labeled TOWER PTS (or
TOWER PTS 24V) and Package #3 contains the tower itself.

Anchor Bolt Install Kit
QTY

Part Number

Description

4

42838

J-Bolts

1

26301

Cardboard Template

Tower Install Kit (keep for use when installing the tower)
8

42839

3/4"-10 Hex Nut

8

42840

3/4" Washer

3

42841

10-24 x 3/4" pan head tamperproof screw

2

42843

6-32 hex nut

1

67478

Polycarbonate light cover

1

68590

LED light board (12-24V AC/DC - 120VAC)

1

ETP-EL-L or ETP-EL12/24

120VAC Strobe Light or 12VDC/24VAC/24VDC Strobe Light


III.

Installation

1. Electrical and telephone line conduits should be run through the foundation and into the center 4"

diameter hole of the tower.

NOTE: To insure proper grounding of all electrical components, the tower mount should be effectively
earth grounded from the grounding stud (located in the electrical box across from the lower access
panel) with 6 AWG or better insulated, stranded copper wire to the metallic power service raceway
(conduit) or an 8 foot or longer corrosion-resistant ground spike. All 120V connections should also be
made inside this electrical box. It is the installer's obligation to ensure compliance with all national,
regional, and local regulations.

2. Pour the foundation at least 2 feet in diameter and 3 feet deep according to your local code and frost

line (see foundation drawing on following page).

3.

Install the four (4) 3/4” - 10 x 24 long anchor bolts below grade with five inches (5”) projecting
above grade
(see foundation drawing on following page). Use the template provided to properly
position the bolts within the concrete foundation.

NOTE: Make sure all connections meet National, Regional, and Local Electric Codes.