Line data input (when line length is known), When line length is known, Line data input – Daiwa TANACOM BULL 500 User Manual

Page 13: When line length is known)

Advertising
background image

11

Line data input

(When line length is known)

This method is used when the line length is known before winding. In the example below,

PE 6 – 280m is wound.

1.

Run line through the levelwind guide and tie it onto the spool.

The levelwind threader makes this process easier. Make sure to

tie the line onto the pin found on the spool to avoid the line

slipping.

8.

Push the power lever forward to maximum and wind the line to

its end.

As the power lever is moved forward, the

P2

display changes

to a tension indicator. Keep line tension between level 3 and 4

while winding on line.

2.

Move the power lever to the OFF position.

6.

When the button is released, the display will then change to the

figure on the left, which shows

P1

.

1

5

7

6

8

Levelwind Guide

Main line

Pin

Power lever

2

Tension indicatar

7.

Press

MODE SETTING BUTTON

once to move to the line

length input mode.

P2

will be blinking.

3.

Connect the clip to the power source (12V DC).

4.

Attach the cord connector to the reel.

See in page 2 for the connection method.

5.

Press the

MODE SETTING BUTTON

and hold for five seconds,

until the display shows

0.0

.

-Do not allow line to rub against the finger guard while

winding as it will scratch the guard.

Advertising